skip to main |
skip to sidebar
The bridge is open to allow the boats in and the locks are opening to allow the ships in. The workers wait to tie the boats to the sides of the docks before closing the locks to bring the water up to level with the other side of the locks. The workers are tethered to the dock so not to go overboard while tying up the boats!

No comments:
Post a Comment